What is the project cutoff

What is the project cutoff

Guidelines What is a project focus?

Contents

What is project discovery?

Discovery: The sum of the amounts found by multiplying the quantities found from the project and the current unit prices of public institutions and organizations. If the manufacturing unit price is not available in public institutions and organizations, the average of 3 offers received from the market is taken, and it is found by including the % Contractor's profit and general expenses.

What is the construction cost?

Building cost, As can be understood from its name, it is the name given to the calculation of the approximate cost of the construction. The approximate cost, determined as a result of the detailed work of more than one engineer, is one of the most important factors of the construction process.

What is 1 Discovery 2 Discovery?

These are; Before the building is built, the exploration made on the projects of the building (architectural, static and installation) is called the first exploration or preliminary exploration. The discovery made by measuring all the productions that have been applied is called II discovery or final discovery.

What is the tender discovery price?

I. DISCOVERY: By the Administration before the Tender Stage It is the total cost of the amount of work determined and the amounts determined in order to complete the work that is thought to be done, with the prices of the year in which the survey was prepared.

What is a construction survey?

According to Civil Engineering; Quantity; It is the measurement of the quantities of the manufacturing items that make up a building, according to their units, from the project. Discovery ; Quantities found for the building, T.C. It is the total cost resulting from pricing with the current unit prices published by official institutions.

What is exploration in the landscape?

Quantity is defined as the total amount of material to be used in the application, and exploration is the calculation of the cost (Hasol, 2005). ). In a broader sense, the quantity is the whole production amount in the project in m, m2, m3, kg, pieces, etc.

How to calculate the cost of a building?

The approximate unit costs of the building are published considering the architectural services of the building. The approximate cost of the building is calculated by multiplying the unit cost determined according to the class of the building with the construction area.

What is a work with an exploration unit price?

A term used in the construction industry. discovery is the sum of the amounts found by multiplying the quantities of the previously quantified (Item No.) production items with the current unit prices. While creating unit prices for Special Poses, an average price is determined by conducting necessary market research.

What is on-site survey?

Preliminary discovery; It is the calculation of the approximate cost of the building using the information at hand before starting the construction. In addition to the construction items, the relevant technical staff must subtract the quantity from the project and add it to the construction items.

Read: 196